PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Laying out block at divider wall detention cells Facing East.jpg Black Iron duct work at the 4th Floor Facing Nouth-East.jpg Installing door frames at the 3rd floor Facing East.jpg Installing wood block along the parapet Facing East.jpg Sprinkler branches-heads at the 4th floor Facing East.jpg Sprinkler branches-heads at the 4th floor Facing North 1.jpg Sprinkler branches-heads at the 4th floor Facing North 2.jpg Started installing insulation at the High Roof Facing North.jpg Black iron duct work at the 4th floor Facing East.jpg
Previous pageNext page Sprinkler branches-heads at the 4th floor Facing East
Sprinkler branches-heads at the 4th floor Facing East